Other Downtown Improvements PDF  | Print |  E-mail

As the Director of Capital Projects and Construction one of the principals of DAC lead the design and construction of improvements behind the curb that included replacing and adding sidewalks, street lights, trees and other landscaping improvements.  The areas of downtown Houston ranged from the streets adjacent to several Fortune 500 company's high-rise office buildings and the historic warehouse district known as NoHo (North Houston) where residential loft apartments require a different, softer, neighborhood ambiance.

Image
Sterrett St. in NoHo

 

The sidewalk improvements provide a first-ever accessible pedistrian connection from San Jancinto St. at Buffalo Bayou through the residential, restaurant and commerical district and back to Minute Maid Ball Park.Image

 
Associated with SWTP PDF  | Print |  E-mail
With the installation of 23 miles of large diameter water line across Houston an equal number of miles of streetscape was improved. The water lines as a minimum required reconstruction of at least half the roadway and adjacent curbs and shoulders or ditches. Installation of new driveways and other often privately owned improvements at the edge of the rights-of-way was replaced.
Image
Sage Rd. at Galleria III
 
Esplanades on Richmond PDF  | Print |  E-mail

Under contract to the Upper Kirby District and Upper Kirby TIRZ, DAC managed the design process and installation of the beautiful landscaping underneath the oaks on Richmond between Buffalo Speedway and Greenbriar.

Image

Read more...
 
Cotswold Phase 3 PDF  | Print |  E-mail

Phase 3 of the Cotswold Program has been completed. The improvements were to the streets and sidewalks on Caroline Street and the streets north of Minute Maid Baseball Park.

 

 

 
Cotswold Phase 2 PDF  | Print |  E-mail

The final contract of Phase 2 of the Cotswold Program is underway. All other contracts are complete and in service. The only remaining project is the Bayou Pedistrian Connections Phase 2C-1. Image

Phase 2c-1, the Bayou Pedistrian Connections project is the last project as time was required to meet the City's desire for the Cotswold team to completed work not done by METRO during the initial light rail construction project. The incomplete METRO work was for the completion of Phase 1 of Allens Landing under the Main Street Bridge.

 

Read more...
 
Cotswold Phase 1 PDF  | Print |  E-mail

The Cotswold Program is in three phases that include 9 projects that adjoin and in some cases overlap. ImagePhase 1 included three projects in the front door of the soon to be opened Minute Maid Baseball Park. The race to complete the streets and the stadium was a tie as they were both complete for opening day. 

Read more...
 
Boone Road Park PDF  | Print |  E-mail

DAC is providing construction management services for the following improvements at Boone Road Park:

  • demolition of asphalt walks, concrete paving and curb, parking lot gate, wood bollards and kiosk, backstop fencing, sand volleyball court, drinking fountain, benches
  • addition of asphalt and concrete walks
  • parking lot expansion
  • new curb and bollards
  • site lighting
  • backstops
  • cricket pitch
  • sand volleyball courts
  • portalet enclosure
  • electrical enclosure
  • site grading and drainage
  • drinking fountains
  • site furnishings
  • plantings and irrigation

Image

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Read more...
 