Home Page arrow Cotswold Phase 2
Associated with SWTP PDF  | Print |  E-mail
With the installation of 23 miles of large diameter water line across Houston an equal number of miles of streetscape was improved. The water lines as a minimum required reconstruction of at least half the roadway and adjacent curbs and shoulders or ditches. Installation of new driveways and other often privately owned improvements at the edge of the rights-of-way was replaced.
Image
Sage Rd. at Galleria III
 
< Prev